|
|
|
We have hand picked a selection of awards that are traditionally used for special achievement awards. This is a small subset of our recommended awards for achievement awards for all sorts of occasions from employee achievement, sport achievement, academic achievement, just to name a few. |
Go to Page: [Prev] [261] [262] [263] [264] [265] [266] [267] [268] [269] [270]
|
|
|
|
|
|
|
|
|
These Glass Awards are packaged in satin-lined, padded gift boxes. 1/2" thick glass, suitable for laser engraving or sandblasting. All Glass Awards are preassembled, bases have protective rubber feet.
Production lead time for this product is 7 days.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Prod # |
|
Description |
|
1-9 |
|
10-24 |
|
25-49 |
|
|
|
|
|
|
|
|
|
TPG2460 |
|
4-3/4" wide x 6-1/2" tall |
|
$47.13 |
|
$44.77 |
|
$42.42 |
|
|
|
|
|
|
|
|
|
TPG2470 |
|
4-3/4" wide x 7-1/2" tall |
|
$48.75 |
|
$46.31 |
|
$43.88 |
|
|
|
|
|
|
|
|
|
TPG2480 |
|
4-3/4" wide x 8-1/2" tall |
|
$51.19 |
|
$48.63 |
|
$46.07 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Hand cut and polished clear acrylic award is finished with a brushed nickel plated base mounted to the front.
Production lead time for this award is 7 days.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Prod # |
|
Description |
|
1-9 |
|
10-24 |
|
25-49 |
|
|
|
|
|
|
|
|
|
RSOY1060L |
|
4" x 8" |
|
$321.75 |
|
$305.66 |
|
$289.58 |
|
|
|
|
|
|
|
|
|
RSOY1062L |
|
5" x 10" |
|
$360.75 |
|
$342.71 |
|
$324.68 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
An uncommon disc of exceptional style award in a rare mix of lights and shadows with a black glass base.
Production lead time for this award is 7 days.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Prod # |
|
Description |
|
1-9 |
|
10-24 |
|
25-49 |
|
|
|
|
|
|
|
|
|
VACFS-355 |
|
6" wide x 6-3/8" tall x 1-1/2" deep |
|
$124.32 |
|
$118.10 |
|
$111.89 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Zona Morado is part of the Chien J. Wang Collection designed by international designer Chien J. Wang. This award features a purple crystal engraving panel. It is connected to another piece of clear crystal ladder. To make it to the top, you must climb one step at a time.
Production lead time for this award is 7 days.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Prod # |
|
Description |
|
1-9 |
|
10-24 |
|
25-49 |
|
|
|
|
|
|
|
|
|
TJWFZM810 |
|
8" wide x 10" tall |
|
$325.00 |
|
$308.75 |
|
$292.50 |
|
|
|
|
|
|
|
Go to Page: [Prev] [261] [262] [263] [264] [265] [266] [267] [268] [269] [270]
|
|
|
|
|
|
|
Stay
Connected: |
|
|
|
|
|
|
|